New Features:

  • MRP: Set OrderNumber field to the top level demand
    • MRP sets
      OrderNumber field on the generated jobs to the parent order number for which
      the order was created for. It is now set to the top level demand’s order
      instead.
  • speed up the peformance of multitasking resources
    • Optimizing and
      adjusting schedules that use multitasking resources is much slower than
      schedules that don’t use multitasking resources.
       
      Changes have been made so optimizes and adjustments to schedules with multitasking
      resource is about twice as fast as it use to be. The time has approximately
      been cut in half.

Corrected Issues:

  • Material Req: Planned Scrap Qty not importing
  • Material Allocations: Operation constrained by
    available date schedules at lead time
  • Incorrect Job Name is shown in SuccessorMO validation
    error
  • MRP not respecting Batch sizes
  • Production Report displays the incorrect quantity
  • Lots: ‘Unable to cast’ error when changing lot
    controlled type

    • Fixed an error
      caused when changing inventory from shelf-life to another lot control type.
  • Unschedule job with successor MO causes error
    • Fixed an issue
      that could cause an error when unscheduling a job with successor MOs defined.
  • The JIT start time varies based on the capacity the
    different eligible resources.

    • The JIT start
      time varies based on the schedule of different resources.
    • The “ideal
      JIT start time” is simply the need time of the operation minus the amount
      of time it takes to process.
    • To take the
      effect of online and offline intervals into account, the “estimated JIT
      start time” is calculated based on the schedule of a sample resource. That
      is, its online and offline intervals are taken into consideration to determine
      when the operation could actually schedule. This time can vary greatly
      depending on which resource is selected for the calculation.
    • Resolution: The
      “estimated just in time start date” is now based on the capacity
      of the resource that would allow the operation to schedule as close as possible
      to “ideal JIT start time”. 
  • Import timing out and freezing computer
  • Impact grids don’t record manual moves
    • Fixed an issue
      where impact data was not recalculated after certain moves.
  • Optimize stops at 10% and freezes
    • Fixed an issue
      that could cause optimize to freeze.
  • JitStartDate calculation results in
    ArgumentOutOfRangeException

    • Fixed an issue
      where If an Operation doesn’t have any eligible resources, calculating its
      JitStartDate would result in an error.
  • Optimize is Slow
    • Fixed an issue
      with overlap that was slowing optimize performance.
  • Jobs pulling material from on-hand instead of allowed
    lots
  • Error when removing allowed lot code from material
    requirement
  • Error log takes a long time to resolve
    • The same set of
      capacity intervals were being assigned to the same resource 9 different times.
      This was causing the same resource to be updated more than 100
      thousand  times

Minor Changes:

  • MultipleWarehouseSupplyAllowed checked for tank sourced
    material results in FailedToSchedule job

    • If a job has
      a  material requirement that can be  sourced from multiple tanks
      (MultipleWarehouseSupplyAllowed is checked), it’s possible the
      job will fail to schedule.
  • Localization V11
    • Spanish
      translation updated.
  • Item.LotUsability field is disabled for new items
    • New items
      created with the Maintain Inventories dialog can be set to lot controlled on
      creation.
  • Move messages logged twice
    • When getting a
      message after a move, it will no longer be shown twice.
  • Improve the naming of BaseObjects
    • Resolved an
      issue that was causing new objects to include long numbers in their names,
      after their type.
  • Remove MrpProcessing.SetJobNeedDatesOnly
    • Removed
      SetJobNeedDatesOnly from list of options for MrpProcessing field on Inventory.
  • Resource Property: Number of Activities Scheduled on
    Resource

    • Added a new
      Resource property that displays the number of activities currently scheduled on
      the resource. This is available on the Activities grid and in gantt labels.
  • Out of range exception from Gantt
    • Fixed an issue
      that could cause an error when switching user language.