Job Manager by Cost Control is a powerful add-on to Dynamics NAV that transforms basic NAV into a full-fledged manufacturing suite. Standard Cost Manufacturing enhances NAV’s base Manufacturing workflow with TreeView Bom’s, Engineering Change Management, and Manufacturing Reports. Cost control goes a step further for “Job Cost Manufacturing” and provides: Enhanced Billing and WIP, Remote Time Entry and Analysis Reports specifically designed for job shops. We’ve worked closely with Cost Control to make sure that PlanetTogether integrates seamlessly with Job Manager.

Compatible Versions
PlanetTogether APS is compatible with NAV 2009, 2010 , and can also be retrofitted to earlier versions.

Here are just a few examples of what you can import from Cost Control:

  • Work Center Groups and Work Centers
  • Machines, Items and Inventory
  • Bill of Material
  • Sales, Purchase and Production Orders
  • Routing Lines and Production Order Components

PlanetTogether also allows you to publish schedules back to Cost Control:

  • Start and End dates at the task level
  • Reported Quantities
  • Reported Time
  • Job Statuses

Cost Control Fields:

 Production Orders

Property COST CONTROL Table Field
Master Job Number Job [Master Job No_]
Job Number Job [No_]
Need Date Job [Ending Date]
Product Job [Job Product No_]
Quantity Ordered Job [Job Qty Ordered]

 

Routing

Property COST CONTROL Table Field
Job Number Job [No_]
Job Task Number JobTask [Job Task No_]
Resource Name JobTask [Resource Name]
Step Required Resource JobTask [Step Resource No_]

 

Bills of Material

Property COST CONTROL Table Field
Item Name Item [No_]
Description Item Description
Unit of Measure Item [Base Unit of Measure]
Routing Number Item [Routing No_]

 

Resources

Property COST CONTROL Table Field
Resource Code Resource No_
Resource Name Resource Name
Unit Cost Resource [Unit Cost]
Department Resource [Resource Group No_]

 

Capabilities

Property COST CONTROL Table Field
Capability Code Resource No_
Capability Name Resource Name

 

Sales Orders

Property COST CONTROL Table Field
Sales Order Number SalesLine INNER JOIN Sales Header [Document No_]
Line Number SalesLine INNER JOIN Sales Header [Line No_]
Open Quantity SalesLine INNER JOIN Sales Header [Outstanding Quantity]
Warehouse SalesLine INNER JOIN Sales Header [Location Code]
Unit of Measure SalesLine INNER JOIN Sales Header [Unit of Measure]

 

Publish Fields

Property COST CONTROL Table Field
Production Order Job No_
Start Date Job [Starting Date]
End Date Job [Ending Date]
Job Task Number JobTask [Job Task No_]
Job Task Start Date JobTask [Start Date]
Job Task End Date JobTask [Finish Date]