Introduction

The Activities view gives users a list of scheduled job activities listed by resource. In this view, users can easily move activities via drag and drop, validate moves before committing to them, and adjust operation and activity and operation status and quantities.

Key Concepts

The activities view is separated into two grids, with a list of resources on the left, and a list of activities scheduled on the selected resource on the right. By selecting an activity, users can edit their schedule via drag and drop. By moving jobs within the same grid, users can adjust the order that activities are scheduled on a resource. If different resources are selected in the top and bottom grids, users can change which resource the activity is scheduled on by dragging the activity to the opposite grid. If a move fails, the line for the selected activity will highlight red in the grid, and move back to where it was originally placed. If a move is successful, the line will highlight green.